Modern methods of construction

Modern methods of construction offer multiple benefits but they can also bring challenges. Matt James, client director – head of education at Aon, and Alison Goodwin, public sector practice leader at Aon, explore how organisations can overcome these challenges.

Modern methods of construction such as modular buildings, flat slab construction and timber framing, can deliver on safety, cost and sustainability. But, as these methods don’t have the track record of more conventional construction processes, it’s essential to engage with insurers before a single brick – or pod – is laid.

What are modern methods of construction?

Modern methods of construction (MMC) are innovative ways of building that embrace new and traditional materials and technologies. Buildings can be constructed using components such as timber frames, precast panels and modules or pods – all of which can speed up the construction process and offer greater flexibility in design. It can also be used when retrofitting, repairing or extending existing buildings.

MMC can also enable large parts of the project to be shifted off-site. For example, with modular buildings, all the necessary components and modules can be produced in factories, sometimes even 3D printed, and then brought to the site for assembly. While it may all sound futuristic, and the approaches used are constantly evolving, MMC already has a 100-year long history. Back in the 1920s, construction firms started using pre-cast concrete in large buildings and infrastructure such as bridges and some of the prefab homes that sprung up in the 1940s to address the post-war housing crisis are still standing today.

What are the benefits of MMC?

There are several drivers behind the adoption of MMC as follows:

  • Safety
    As a significant part of the construction process can be shifted offsite, health and safety is easier to control. This, and the reduction in time spent on site, should help to reduce accidents and fatalities.
  • Speed
    Offsite and modular construction also feeds into faster build times. Figures from the Royal Institute of British Architects (RIBA) estimate reduction in construction programme times are between 20% and 60%.(1)
  • Savings
    Faster construction times and greater control over production mean RIBA estimates a 20% to 40% reduction in construction costs. It also points to another factor feeding into these savings – a 70% reduction in onsite labour.(1)
  • Sustainable
    MMC can be used to produce greener buildings but the process itself is also much more energy efficient than more traditional methods. Research by WRAP found that MMC can reduce energy consumption by 67% reduction; reduce waste onsite by 70%-90%; and cut deliveries to the construction site by 90%. (1)

As well as being positive for the organisations commissioning MMC projects, these benefits can help the UK achieve some of its key objectives including plugging the housing shortage and reaching net zero.

What are the challenges with MMC?

For an organisation considering an MMC project, the key challenge is insurance. Although insurers are supportive of MMC, its use can change the risk profile of a building, both during the design and build phase but also once it’s in use. Unfortunately, as many of the processes are new or evolving, there are plenty of unknowns, and some elements make insurers more nervous.

Fire risk is a key issue. The use of sustainable materials, whether that’s wool for insulation or a timber frame, raises concerns around fire resistance. Once a fire takes hold, will it be possible to contain it or will it result in a total loss? This would lead to a significant claim but could also endanger lives if the fire spreads quickly.

The use of renewable energy within a building can also increase fire risk. Renewable energy, energy recovery and storage systems, including solar panels and electric vehicle charging points, are potential fire inception hazards.

Remedial works can also be more expensive on MMC buildings. Bespoke replacement items may be required and costs can escalate further where damage is to a modular building. For example, if the module is towards the bottom of a stack, all the modules above it may need to be removed to replace or repair it. In some cases, it may be more cost-effective to demolish the building entirely.

It's not all doom and gloom though as many elements of MMC do not overtly impinge on the insurance programme. Some can even improve the risk profile, for example, energy efficient lighting (LED) and heating (heat source pumps) are both regarded as lower risk than more traditional options.

The shift from onsite to offsite processes is another positive from an insurance perspective, especially during construction. As well as fewer accidents, as more of the work takes place offsite in controlled environments such as factories, there’s also a lower risk of delays due to the Great British weather.

Insuring your MMC project

Engaging early with insurers is essential if your organisation is looking to secure affordable insurance for an MMC project. We recommend working with all key stakeholders – insurers, designers, project managers and facilities managers – at design stage.

As well as ensuring the building is insurable and meets the requirements of all parties, this will help to avoid costly alterations, retrofitting and compromise at, and post, build stage. Additionally, insurers can bring considerable experience of MMC to the table: they will have seen other projects and will be able to share their insight with you. This could improve a building’s risk profile but it might also highlight potential cost savings or alternative approaches that might benefit your project. With the insurance industry keen to support MMC, speaking to them early will ensure any projects strike the right balance between sustainability and insurability.

More information

To find out more about modern methods of construction and how to secure insurance for an MMC project or building, speak to your Aon account manager or contact Matt James ([email protected]) or Alison Goodwin ([email protected]).

1 MMC0030 - Evidence on Modern Methods of Construction (parliament.uk)

 

About Aon

Aon plc (NYSE: AON) exists to shape decisions for the better — to protect and enrich the lives of people around the world. Through actionable analytic insight, globally integrated Risk Capital and Human Capital expertise, and locally relevant solutions, our colleagues in over 120 countries and sovereignties provide our clients with the clarity and confidence to make better risk and people decisions that help protect and grow their businesses.

Whilst care has been taken in the production of this article and the information contained within it has been obtained from sources that Aon UK Limited believes to be reliable, Aon UK Limited does not warrant, represent or guarantee the accuracy, adequacy, completeness or fitness for any purpose of the article or any part of it and can accept no liability for any loss incurred in any way whatsoever by any person who may rely on it. In any case any recipient shall be entirely responsible for the use to which it puts this article.

This article has been compiled using information available to us up to 05/06/2024.

Aon UK Limited is authorised and regulated by the Financial Conduct Authority. Registered in England and Wales. Registered number: 00210725. Registered Office: The Aon Centre, The Leadenhall Building, 122 Leadenhall Street, London EC3V 4AN. Tel: 020 7623 5500.